您好,欢迎来到刀刀网。
搜索
您的当前位置:首页整车开发过程中的英文缩写-汽车行业

整车开发过程中的英文缩写-汽车行业

来源:刀刀网
整车开发过程中的英文缩写-汽车行业

整车开发过 程中的英文 缩写-汽车行 业的你一定 要知道的 英文缩写 (按首字母排序) 100% Cal

100% Calibration 100% IVER

100% Integration Vehicle Engineering Release 100% PPAP All parts at full PPAP for Vehicle program 100% SVER 100% Structure Vehicle Engineering Release 65% Cal 65% Calibration 80% Cal 80% Calibration 8D 8 Disciplines A Alpha A MRD

Alpha Material Required Date A/T Automatic Transmission A/T Automatic Transmission AA Architecture Approval AAM

Alliance of Automobile Manufactures ABS Anti-lock Brake System or Anti-Block Steering AC Architecture Confirmation ACE Assistant Chief Engineer ACT Activity ACT BOM

Assembly Component Tree BOM AD Alternatives Development ADV

Analysis / Development / Validation ADV

Analysis, Development and Validation AE Application Engineer AE Application Engineer AEM

Assimilability evaluation method AFI Architecture Framing Initiation AIAC Automotive Industry Action Group ALY Alloy AMT

Automatic Machincal Transmission ANSI American National Standards Institute AP Advanced Purchasing AP Assembly Plant APB

Automotive Product Board APD Approved Product Description APE Annual Program Execution APEC

Asia Pacific Economic Cooperation APQP/CP

Advanced Product Quality Planning and Control Plan APSB Asia Pacific Strategy Board AR Appropriation Request ARC

Architecture Refinement Complete ASB Automotive Strategy Board ASC ASE

Automotive Safety Engineering ASE Aftersales Engineering ASN

Advanced shipping notice ASSI Architecture Statement of Strategic Intent

整车开发通用英文缩写(按首字母排序)英文全称 Assy Check-in Assembly Line Check-in Assy PPAP Assembly Line PPAP Assy PPAP Assembly Line PPAP

Assy PPV Assembly Line Products and Process Validation

Assy PPV Assembly Line Production and Process Validation Assy Run-Off Assembly Line Run-Off Assy Run-off Assembly Line RUN-Off

Assy Run-off MRD Assembly Line RUN-Off Material Requied Date

ATC Auto Temperature Controller ATF Automatic Transmission Fluid ATT Attachment ATT Actual takt time

AVD Advanced Vehicle Development AVDC Advance Vehicle Development Center

AVD-LT Advanced Vehicle Development-Leadership Team AVDP Advanced Vehicle Development Process (Time between DSI and VPI) AVPM Advanced Vehicle Planning Manager

B Beta B Build

B MRD Beta Material Required Date B+U Building and Utility

BAD Build Authorization Document BC Business Case

BCM Body Control Module BDC Body Distributon Central

BESC Base Engine Steering Committee BIQ Building in Quality

BIR Prototype Build Issue Report BIR Build Issues Resolution BIR Build Incident Report BIR Bulding issue report BIW Body-In-White BIW Body in White

BOD Bill of Design BOE Bill of Equipment BOM Bill of Material BOM Bill of Material BOM Bill of Material BOM Bill Of Material BOM Bill Of Material BOM Bill of Material BOP Bill of Process BOP Bill Of Process BP Break Point

BPD Business Plant Deployment BPP Best people practices BPR Business plan recompose BS Body Shop

BSD Build Site Direction BUFFER Buffer

C/CAP Construction/Conversion and Acceleration Plan CAB Change Approval Board CAC

CAFE Corporate Average Fuel Economy Cal Calibration

CARE Customer acceptance review evaluation CARE Customer Acceptance & Review Evaluation CC Concept Confirmation CC Consolidation Center CC Confirmation Clinic

Cert LSO Certification Lift Stop Order CET Cold Environment Test CH Chassis Department

CI Concept Initiation

CIM Customer Interface Manager CIP Continue Improve Process CIP Continue Improve Process CIT Continuous Improvement Team CIT Compartment Integration Team CMC Container Management Center CME Change Management Engineer Cmk N/A

Cmk Capability Machine Index CMM

C-NCAP China New CAR Assessment Process COC Centre of Competence COE Center of Expertise CP Control Plan

CPIT Current Product Improvement Team Cpk Complex Process Capability Cpk Process Capability Index

CPQE Current Product Quality Engineer CPV Cost per Vehicle

CR/DN Change Request / Decision Notice CR/DN Change Request/Decision Notice CRB Change Review Board CS Contract Signing CS Contract Signing CS1Controled Shipping 1 CS2Controled Shipping 2

CSC Controls Steering Committee CSI Customer Satisfaction Index CSI Customer Satisfaction Index

CSN Current Sequence Number CSO Contract Sign-Off CSO Contract Sign-Off (VDP)

CSO HC Contract Sign-Off Health Check CSO HC Contract Sign-Off Health Check CT Cycle Time CT Cycle time CT Creativity Teams CT Critical Test

CTS Component Technical Specification CTT Common Timing Template

CVER Concept Vehicle Engineering Release

CVER LL Concept Vehicle Engineering Release Long Lead CVIS Completed Vehicle Inspection Standards CVQC Completed vehicle quality ceter

CVQCB Completed vehicle quality ceter board CVT Continuously Variable Transmission D.Q.R

DAS Design & Analysis Section DC Deliver Charter

DCN Design Change Notice DCN Design Change Notice DCP Dimension Control Plan DCS Design Concept Sheet DCT Double Clutch Transmission DD Direct Delivery

DDSP Driver Door Switch Pack DEI Die Engineering Integration DFA Design for Assembly

DFM Design for Manufacturability

DFMEA Design failure mode and effects analysis DFMEA Design FMEA

DIFF Differential DL 3b Design Level 3b DMS Dealer Manage System DOL Dealer On Line DP Demand Plan DPV Defects per vehicle DPV Defect per Vehicle

DQ&V Design Quality & Validation DR Direct run

DRC Design Review Committee DRE Design Responsible Engineer DRE Design Release Engineer DRE Design release engineer DRL Direct run loss Drop Off Drop Off

DS44HIGH SPEED DURABILITY TEST DSG Direct shift gearbox DSI Document of Strategic Intent DSM Driver Seat Module DSO Design Sign Off

DTA Design Theme Alternatives DTC Diagnostic Trouble Code DV Design Validation DV Design Validation DVP Design Validation Plan DVT Dynamic vehicle test

E/T/C Engine/Transmission/Controller EBA Emergency Brake Assistant

EBD Electronical Brake Distribute EBOM Engineering BOM EC Embedded Controller ECC ERP Central Component ECR Engineering Change Request ECR Engineering Change Request ECR Engineering Change Request ECR Engineering Change Request ECS Engineering Change Summary ECT Emission Control System EDS Electronic Data Systems

EEVC European Enhanced Vehicle-Safety Committee EFEO Emissions & Fuel Economy

EGM Engineering Group Manager EI&S Electronics Integration & Software ELV End of life vehicle EMlS Emission

EMS Engine Management System ENB Build-Test Section

E-NCAP Euro New Car Assessment Process ENG Engineer

EOA End of Acceleration EOLT End of Line Test EP Engineering Prototype

EPA Environmental Protection Agency EPC Engineering Program Committee EPN Engineering Project Number ERD Early Requirement Document ESB European Strategy Board ESO Engineering Sign Off

ESO Engineering Sign Off ESO Engineering Sign-off ET Engineering Technology EV Engineering Vehicle EWO Engineering Work Order EWO Engineering Work Order EWO Engineering workorder Exp Cal Experimental Calibration FA Final Approval FAC

FATG Final Approval to Grain FBIW First Body in White Complete FE Functional Evaluation

FE LSO Fuel Economy Label Lift Stop Order FIVC First Integration Vehicle Complete FIVC First Integration Vehicle Complete FLO Factory Layout FM

FM Finance Manager FMC First Mule Complete FMC

FMEA Failure model effectiveness analysis FMEA Failure model effectiveness analysis FMEA Failure Mode and Effects Analysis FMEA Failure mode and effects analysis FMEA Failure Mode and Effect Analysis FMS Flexible manufacturing systems

FMVSS Federal Motor Vehicle Safety Standards

FPPV BIW First Product/Process Body in White Complete FPPVC First Product/Process Validation Vehicle Complete FPS

Fixed Point Stop

FTC First Time Capability FTP/FTQ First time pass/quality FTQ First time quality FWD Four Wheel Drive G Gamma

G MRD Gamma Material Required Date G/L Group leader GA General Assembly GA General Assembly

GADT Global Architecture Development Team GBOM Global Bill of Material

GMNA General Motors North America GMPT General Motors Powertrain

GPDC Global Product Development Council GPDP Global Powertrain Development Process GPDS Global Product Description System GSD Global Segment Director GSS Global Sales and Service

GVDP Global Vehicle Development Process GVDP Global Vehicle Development Process GVDP Global Vehicle Development Process GVDP Global Vehicle Development Process GVDP Global Vehicle Development Process GVDP Global Vehicle Development Process GVLE Global Vehicle Line Executive GVW Gross Vehicle Weight GW Gateway

HET Hot Environment Test HRC Hardware Release Center

ICD Interface Control Document IDR Initial Data Release

IDSR Integration Driven Subsystem Requirement ILP Inbound Logistic Planning

IMES Integration Manufacturing Executive System Initial Cal Initial Calibration

IOM Inspection operator method IOS Inspection operator summary

IPPE integrated Product and Process Engineering IPTV Incident per Thousand Vehicles

IPTV Incidents Per Thousand Vehicles IPTV Incidents Per Thousand Vehicles IPTV Incidents Per Thousand Vehicles IR Incident Report

IRP Issue Resolution Process IRR Internal Rate of Return

ISO International Standard Organization IV Integration Vehicle

IV MRD Integration Vehicle Material Required Date IVBR Integration Vehicle Build Readiness Review IVER Integration Vehicle Engineering Release

JIS Just In Sequence JIS Just In Sort

JIS Job Instruction Sheet JIT Just In Time JIT Just In Time JPH Job per Hour JRS Joint Ride Session JSC

JSC-GP Joint Sourcing Committee - General purchase Kcc

Key Control Characteristic

KCC Key Control Character

KCDS Key Characteristic Designation System KO Kick-Off

Kpc Key Product Characteristic KPC Key Product Characteristic KPC Key product characteristic KPC Key product characteristic KPC Key process control KPC Key process control

LAAMSB Latin America, Africa, Middle East Strategy Board LCL Lower Control Limit

LCS Logistic Confirmation Sheet LL Learning Loop LL Long Lead

LLPR Long Lead Production Release LM Launch Manager LOU Line of Usage BOM LSL Lower Specification Limit

LSP Lean sales and marketing prograne LTR Launch Team Release LWO Logistic Work Order M+E Machine & Equipment MAC

MBOM Manufacturing BOM MDS Materiel Data Sheet ME Manufacture Engineer ME Machine and Electronic ME Manufacturing Engineering ME Manufacturing Engineering

MEC

MEIS Manufacturing Engineering Info System MES Manufacturing Execution System MES Manufacturing Execution System MFG Site Dec Manufacturing Site Decision MIC Marketing Information Center MILKRUN Milkrun MKT Marketing

MMR Manufacturable Math Release MO Manufacturing Operations MP OTS 100%100% Made Parts in OTS MP OTS 100%100% Made Parts in OTS MP PPAP Made Parts PPAP MP PPAP Made Parts PPAP

MP PPV Made Parts Production and Process Validation MP PPV Made Parts Production and Process Validation MPS Master Planning System

MPV Multi-Purpose Vehicle MR Manufacturing Requirements MRD Material Required Date MRD Material Requirement Date

MRD Material Required Date (for physical builds) MRD Math Required Date (for virtual builds)

MRE Manufacturing Responsible Engineer MS Manufacturing Studies

MSA Measurement System Analysis MSA Measurement System Analysis MSA Measure System Analyse MSA Measurement system analysis MSS Market Segment Specification

MSS

MSS Market Segment Specification MT Manual Transmission

MT&E Machines, Tools and Equipment MTS Manufacturing Technical Specification MVB Manufacturing Validation Build MVB Manufacturing Validation Build

MVB (ns)Manufacturing Validation Build (non saleable) MVB (s)Manufacturing

Validation

Build

(saleable)

MVBns

Manufacturing Validation Build Non-Salable

MVBs Manufacturing Validation Build Salable MVSS Motor Vehicle Safety Standards

MWO Manufacture Work Order MY Model Year

MYM Model Year Manager NAO North American Operations NEO New Employee Orientation NOA Notice of Authorization NOD Notice of Decision NOD Notice of Decision NPV Net Present Value NRD Normal Road

NSB North American Strategy Board OBD On Board Diagnostics

OEM Original Equipment manufacturers

OEM Run-Off Original Equipment Manufacturer Run-Off OEM Run-off Original Equipment Manufacturer Run-off OJT On Job Training

OPO Office of Product Operations ORS Occupant Restraint System

OT Overtime

OTD Order to Delivery OTP On Time Performance OTS

OTS Off-tool Sample OTS Off-tool Sample OTS Off-tool Sample OTS OFF-TOOL-SAMPLE OTS QV OTS Quality Valve OTS QV OTS Quality Valve

OTS TG2Off Tooling Samples Tooling Go Level 2 OTS TGL2Off Tooling Samples Tooling Go Level 2

P Pilot P Pilot

PA Production Approval PA Program Administrator PaC Physical Alpha for Customer PACK Packaging

PAD Product Assembly Documentation PAM Product Assemble Manual PAM Product Assemble Manual

PAPIR Product and Process Integration Review PAS Packaging Approval Sheet

PAS Parking Aid System PAS Parking Aid System PbC Physical Beta for Customer PBS Painted Body Store PC Deliver Pilot to Customer PC Pullcord

PC Problem Communication

PC&L Production Control and Logistics PCL Production Control Manager PCM Powertrain Control Module PCM Process Control Manager PCN Project Cost Change Notice PCN Project Costbook Change Notice PCR Problem communication report PCR Problem communication report PCR Problem Communication Report PCR Problem Communication Report PDC Parking Distance Control PDC Parking Distance Control PDCA Plan、Do、Check、Action PDCA Plan-Do-Check-Action PDI Product delivery inspection PDI Preliminary Data Indicator PDI Pre-delivery Inspection PDS Product Data Structure PDT Product Development Team PDT Product Development Team PDT Product Development Team PDT Product Development Team PDT Product Development Team PE Product Engineering PET Program Executive Team PET Program Execution Team PET Program Execution Team PFI Program Framing Initiated

PFMEA Process failure mode and effectsanalysis PFMEA Process FMEA

PFMEA Process failure mode & effects analysis PFSE Product Focus Systems Engineer PG3Powertrain Gateway

PgC Physical Gamma for Customer

PGM Program Management / Project Management PGM Program Management

PGM Program Management Pilot Pilot Pilot Pilot

Pilot QV Pilot Quality Valve

Pilot MRD Pilot Material Requied Date Pilot MRD Pilot Material Required Date Pilot QV Pilot Quality Valve PIM Powertrain Interface Manager PLM Production Launch Manager PLP

PM Programme Manager PM Program Manager PM Program Manager PM Plan maintain

PM Prevention Maintenance PM Program Manager

PMO Program Management Office PMP

PMT Product Management Team PN Part NO. PP Pre-pilot PP Pre-Pilot PP Pre-pilot P-P Pre-Pilot

PP PPAP Purchased Parts Production Parts Approval Process PP Appr.Purchased Parts Approved

PP ESO Purchased Parts Engineering Sign Off PP OTS 100%100% Purchased Parts in OTS

PP OTS 80%80% Purchased Parts in OTS PP OTS 80%80% Purchased Parts in OTS PP PPAP Purchased Parts PPAP PPA Product Planning Approval

PPAP Production Parts Approval Process PPAP Production Part Approval Process PPAP Production Part Approval Process PPAP Production Part Approval Process PPAP Production Parts Approval Process PPAP Production Part Approval Process PPAP Production Part Approval Process PPAP Production Part Approval Process PPC Deliver Pre-Pilot to Customer

PPC Product Program Content 中文含义 100%标定

100%集成车工程发布

为了整车项目,所有零件须完全通过PPAP 100%结构车工程发布 65%的动力总成标定 80%的动力总成标定 问题解决8步法

Alpha阶段(动力总成产品开发的一个阶段)Alpha样件需求日期

自动变速器 自动变速器 架构批准 汽车制造商联盟 防抱死制动系统 架构确认

总工助理 工艺路线 总成件树形BOM 主题开发 分析/开发/验证 分析,开发和认证 应用工程师 应用工程师 可装配性评估方法 架构框架启动 美国汽车工业行动集团 铝合金

机械式自动变速器 美国国家标准协会 提前采购 总装厂 汽车产品委员会 批准的产品描述 年度项目执行 亚太经济联盟

先期产品质量规划和控制计划

亚太战略委员会(通用汽车的高层管理组织)项目预算 架构优化完成

汽车战略委员会(通用汽车的高层管理组织)经销商售后管理系统

汽车安全工程 售后工程 发货通知单 战略意向的架构陈述 启动现场安调

装配线 通过PPAP 装配线通过PPAP

装配线交付后的产品工艺验证 装配线交付后产品工艺验证 装配线试装 交样日期

装配线整线打通,启动试装,允许手工装配装配线 自动空制器 自动变速箱油 附件 实际单件工时 先期车辆开发 先期车辆开发中心 前期整车开发-领导小组

先期车辆开发流程(在DSI与VPI之间) 先期车辆计划经理

Beta阶段(动力总成产品开发的一个阶段)制造 Beta样件需求日期 土建公用 试制授权文档 业务计划 车身控制器 车辆调配中心

发动机总成战略转向委员会 制造质量 试制问题报告 试制问题 装车问题报告 造车问题报告

白车身 白车身 设计清单 设备清单 物料清单 物料清单 物料清单 物料清单 物料清单 物料清单 工艺清单 工艺清单 断点 业务计划实施 最佳人员准则 业务流程重组 车身车间 试制现场指导书 线边缓存区

土建/改造和生产提速计划 更改审批会 服务热线专员 公司平均油耗 动力总成标定 用户接受度和审查评估 验证概念 集散中心 确认临床 通过排放认证通知 寒区试验

底盘部 提出项目概念 客户服务经理 持续改进 持续改进 不断改进小组 车厢集成小组 空箱管理中心 更改管理工程师 临界机器能力指数 机器设备能力 三坐标测量

中国标准新车评估体系 能力中心 经验总结中心 控制计划 现有产品改进小组 过程能力指数 稳定过程的能力指数 现有产品质量工程师 单车成本 更改决议

变更申请/决议通知 更改评审小组 动力总成签署项目合同 合同签订 一级受控发运 二级受控发运

控制模块战略转向委员会 用户满意度指标

售后满意度 流水号 合同签署

整车签署项目合同(VDP术语)合同签署健康检查 合同签署健康检查 制程周期 周期时间 创造性工作小组 关键试验 零部件技术标准 标准2级进度模板 概念车工程发布

概念车工程发布--长周期 整车检验标准 整车质量中心 整车质量目视板 无级变速器 合格率概况 设计分析科 递交项目章程 设计更改通知 设计更改通知 尺寸控制计划 概念设计表 双离合器变速箱 直接投线 驾驶席门控开关 模具工程集成 装配工艺性设计 制造工艺性设计

设计失效模式和效果分析 设计失效模式分析 差速器 设计阶段3b 经销商管理系统 经销商在线系统 需求计划 单车缺陷数 单车缺陷数 设计质量和验证 直接通过率 设计评审委员会 设计和发布工程师 设计发布工程师 设计发布工程师 直接通过损失率 停产

高速耐久试验(MGRES 标准)双离合器变速箱 战略意向书 驾驶席座椅控制模块 设计签署 设计主题选项 诊断故障码 设计验证 产品设计验证 设计验证计划 整车综合动态测试 发动机/变速器/控制模块 紧急制动辅助系统 电子制动力分配系统

工程BOM 控制模块 ERP核心组建 工程更改请求 工程更改请求 工程更改申请 工程项目变更申请 工程变更摘要 电子控制自动变速器 电子数据系统

欧洲提高车辆安全性委员会 排放和燃料经济 产品工程小组经理 电器零件集成和软件 整车寿命结束 排放

发动机管理系统 试制试验科

欧洲标准新车评估体系 工程师 生产提速的完成 生产线试验结束 工程样车(件) 环境保护厅 工程项目委员会 工程项目数目 早期的要求文件

欧洲战略委员会(通用汽车的高层管理组织)发动机整机 工程签署 工程签署

工程签署 工程技术 工程样车 工程工作指令 工程更改号 工程更改流程 尝试性标定 批准正式生产 集团销售经理 生产最终批准 第一轮白车身完成 功能评估

通过油耗认证的通知 第1辆集成车制造完毕 第一轮集成车完成 工厂布局 功能尺寸 财务经理 第一轮骡子车完成 区域售后支持 失效模式分析 失效模式分析

潜在失效模式及后果分析 失效模式和后果分析 失效模式和影响分析 柔性制造系统 联邦汽车安全标准

第一轮产品/工艺白车身完成 第一轮产品/工艺验证车辆完成 固定停止位置

首次能力 一次通过合格率 下线合格率 四轮驱动

Gamma阶段(动力总成产品开发的一个阶段)Gamma样件需求日期

工段长 总装 总装

全球架构开发小组 全球物料清单 通用汽车北美分部 通用汽车动力总成分部 全球产品开发理事会 全球动力总成开发流程 全球产品管理系统 全球细分主管 全球销售和服务 全球整车开发流程 整车开发流程 整车开发流程 全球汽车开发流程 全球整车开发流程 整车开发流程 整车平台执行 车辆总重 网关 热带试验 硬件发布中心 接口控制文件

初始数据发布 集成驱动子系统要求 入厂物流规划 生产执行系统 初始标定 检验操作方法 检验操作概要 集成产品与工艺工程 每千辆车的故障率 每一千台车事故率 每千辆车的故障率 千辆车故障率 事故报告 问题解决流程 内含报酬率 国际标准化组织 集成车

集成车的物料需求日期 集成车制造准备评审 集成车工程发布 排序供货

供应商排序供货方式 岗位指导书 及时供货

供应商及时供货方式 生产节拍 联合评审 生产采购委员会

联合采购委员会-一般采购 关键过程控制特性

关键控制特性 产品关键特性定义系统 启动 关键产品特性 关键产品特性 主要产品特性 主要产品特性 关键过程控制 关键过程控制

通用的拉美,非洲,中东战略委员会管制下限 物流确认单 学习周期 长周期

长周期的产品发布 启动经理 整车BOM行 规格下限 精宜营销 启动小组释放 物流属性更改号 机器设备 区域经理 制造BOM 物料数据单

样车试制工程师或生产线制造工程师 电器设备 制造工程 制造工程 区域市场支持 制造工程信息系统

制造执行系统 制造执行系统 确定生产厂址 市场信息中心 循环取货 营销 制造数模发布 生产管理部门

100%自制件达到OTS状态 100%自制件达到OTS状态 自制件 通过PPAP 自制件通过PPAP

自制件生产线交付后的产品工艺验证 自制件生产线交付后的产品工艺验证 主计划系统 多用途轿车 制造要求 交样日期 物料需求日期

物料需求日期(用于制造样机) 数模需求日期(用于虚拟制造) 制造工程师 制造车间 测量系统分析手册 测量系统分析 测量系统分析 测量系统分析 市场细分规范 区域销售支持

市场分割规范 手动变速箱 机床,工装和设备 制造技术标准

用于认证制造工艺的整车制造 制造验证造车

用于认证制造工艺的整车制造(不可销售的)用于认证制造工艺的整车制造(可销售的)非销售制造验证造车

销售制造验证造车 汽车安全标准 制造属性更改号 年度款 车型年经理 通用的北美分部 新员工培训 授权书 决议 决议通知 净现值 一般公路

通用的北美传略委员会(通用的高层管理组织) 车载诊断系统

原始设备制造商(主机厂) 零件供应商

工装设备具备试生产条件

零件供应商工装设备具备试生产条件 在岗培训 产品高层管理组织 乘员约束系统 加班

订单到货时间 及时性能 装车评审 工装样件 工装样件 工装样件 工装样件 OTS质量阀

OTS交付状态满足质保的开阀要求

OTS质量阀,OTS交付状态满足质保的开阀要求

OTS设计达到TG2阶段,发布图纸用于供应商启动工装和设备投入

OTS设计达到TG2阶段 批量试生产 小批量生产 批准正式生产 项目管理专员

提交客户的Alpha样机 包装规划 产品装配文件 样车装配指南 产品装配手册 产品和工艺集成会议 包装确认单 泊车辅助系统 泊车辅助系统 提交客户的Beta样机 油漆车身存储区 向客户提交Pilot产品 拉环

问题信息

PC&L部门(GM的一个部门) 生产控制与支持 动力总成控制模块 工艺控制负责人 项目更改通知单

项目Costbook更改通知单 问题交流报告 问题交流报告 问题交流报告 问题交流报告 泊车距离控制 泊车距离控制

计划、实施、检查、行动 计划,实施,检查,行动 产品交付检查 初步数据指示器

车辆行运“零公里”检查报告

产品数据结构,在SCM中用到的数据对象,集成了BOM 、工艺和工厂布局信息

产品开发组 产品开发小组 产品开发小组 产品开发小组 产品开发小组 产品工程 项目执行小组 项目组 项目执行小组 项目框架启动

过程失效模式和后果分析 工艺失效模式分析 过程失效模式分析 产品系统工程师 关键里程碑节点

向客户发运Gamma样机 项目管理 项目管理 项目管理 试生产 试生产

试生产质量阀满足启动试生产的开阀要球 Pilot交样日期 Pilot的物料需求日期 试生产质量阀

满足启动试生产的开阀要求 动力总成接口经理 生产启动经理 单车利润表 项目工程经理 项目经理 项目经理 计划维护 预防性维护 项目经理

项目管理办公室(通用的一个部门) 常规尺寸 产品管理小组 零件号 前期试生产

预试生产 试生产 试生产

外购件完成生产件批准程序

因篇幅问题不能全部显示,请点此查看更多更全内容

Copyright © 2019- gamedaodao.com 版权所有 湘ICP备2022005869号-6

违法及侵权请联系:TEL:199 18 7713 E-MAIL:2724546146@qq.com

本站由北京市万商天勤律师事务所王兴未律师提供法律服务